Mixes
4 bag mix (3,000 psi) Footer mix
5 bag mix (3,500 psi) General flat work
6 bag mix (4,000 psi) Flat work needing to carry heavy loads.
Mixing Hours
Monday through Friday 8:00 am to 4:00 pm.
Saturdays 8:00 am to 12:00 pm.
Requirements
You need a 1/2 ton pick-up truck or
larger to tow the trailer with a towing rating of at least 7,000
pounds.
A 2" trailer ball. |
Additives
We add an air-entraining
additive to give our
concrete good freeze thaw resistance.
When the air temperature
rises above 80 degrees
we add a retarder to give you more working time
or when you need to make multiple trips.
We can add Fiber Mesh to
your mix
to replace the need for wire concrete mesh.
Use our handy concrete calculator to
figure out how much concrete you need for your project. Always round up
to the next 1/4 yard of concrete when calculating your requirements. You
do not want to come up short on concrete. |